banner

Homepage
General Club Info
Club Awards
Member's Rides
Calendar
Land Use
Trip Reports
Picture Gallery
Links & Downloads
Classifieds
Contact Info

2008 Calendar:

SANTA CRUZ 4-WHEEL DRIVE CLUB
2008 RUN LIST

Date Trail / Trip Description Trail Master
Rating
Jan 26 Holiday Party at the Bittersweet Bistro Holiday Party Committee
YUM!
Feb 15 - 18 Twain Harte Snow Run Jeffrey Ellis
easy
Mar 28 - 30 Pismo Beach Robin Down
easy - moderate
April 18 - 21 Johnson Valley Jesse Aguilar
advancedadvanced
May 23 - 26 Barney Riley (cancelled) Ron Kilcrease
easy
June 21 - 22 Friends of the Rubicon Work Day Eli Casey
moderate
DATE TBD Rubicon (Postponed - may be combined with Aug) Rick Frier
difficult
Aug 7 - 10 Sierra Trek (Fordyce Creek)
- How about Rubicon?
Rick Frier
difficult
Aug 29 - Sep 1 Hermit Valley Mick Sweeny
Moderate
Oct 11- 12 Barrett Lake James Anthony
Moderate
Nov 26 - 30 Red Rock Canyon (Mojave area) Brian Potter
easy
Dec 13 - 14 TBD (was Clear Creek) Brandon Chappell
easy - moderate
June 21
July 19 or 26 (not sure yet)
Aug. 23rd


The club would like to make a note to all members that the “Friends of the Rubicon 2008 work days” are (tentative): June 21, July 19 or 26 (not sure yet); and Aug. 23rd. and encourage those who can make it to please attend.

Friends of the Rubicon URL - http://www.delalbright.com/Rubicon/rubicon.htm

 

 

Trail Rating Difficulty Guide:

= These are usually considered rough fire roads that stock vehicles could easily conquer. Stock ride height, stock tires, open differentials and little or no previous four wheeling experience.

= These are more challenging trails for a mildly modified vehicle. 2-3" lift, up 32" tires, limited slip differential in at least one axle, would have moderate difficulty traversing these trails. A so-equipped rig could expect minor body damage.

= These are quite challenging trails, even for a well equipped rig with a novice driver. Rig improvements would comprise of 33-35" tires, 4-5" lift, at least one locking differential, winch, and a full roll cage. These trails usually have numerous difficult sections composed of large boulders and crevasses that are challenging for even an experienced driver to negotiate. Higher risk of body damage to occur.

= This an extreme trail, generally reserved for very experienced drivers in very well equipped rigs. Rig improvements would include greater than 35" tires, Locking differentials in both axles, Greater than 7" lift, winch, rocker guards, body armor, full roll cage. Body damage and mechanical failures are likely. Extreme challenges that include massive boulders, vertical climbs, and pinch points.

See 2009 Calendar

See 2007 Calendar

 

©2003-2010 Santa Cruz 4 Wheel Drive Club.